EasyStartUpBlue Steel Metal Fabrication
ProceduresJob Types
HomeJobsPeopleReportsTwin
Messages
Settings
View as
ProceduresJob TypesHomeJobsPeopleReportsTwinMessagesSettings

EasyStartUp — Start your business up. Every day. Eventually without you.

CreateHomeMessagesSettings

Equipment · Procedure

Welding Bay Setup

Stand up the welding bay for the day — gas, ground, and machine settings — before the first arc.

Edit Start training
05
Steps
v1
Version
10
Duration min
03
PPE items

01 / Steps

  1. 01
    PPE

    Don welding helmet, gloves, and apron

    Full welding PPE and a current welding certification before you strike an arc.

  2. 02
    Step

    Connect the ground clamp to the work

    Clamp directly to the work table or piece — never through a hinge or the floor.

  3. 03
    Warningcaution

    Confirm shielding gas flow and no leaks

    Soap-test fittings. A gas leak is a fire and asphyxiation hazard in the bay.

  4. 04
    Step

    Set amperage for material thickness

    Dial amperage to the chart for the plate gauge and run a scrap test bead.

  5. 05
    Quiz

    Knowledge check

    Confirm where the ground attaches.

    Q: Where does the ground clamp attach?

02 / Details

Status
Published
Category
Equipment
Author
Lisa Tran
Updated
May 12, 2026

03 / Required PPE

  • Welding helmet
  • Welding gloves
  • Leather apron

04 / Versions

  • v1CurrentMay 12

05 / Certified

  • Derek Fosterv1Verify