Equipment Install · Field
Install pallet racking — Oakwood Logistics DC
Complete
Status
6/6
Checklist
Install Crew
Crew
02
Proof
01 / Job checklist
All required done- Confirm site access + customer sign-in
- PPE on (hard hat, steel toes, hi-vis)
- Lockout/tagout existing power
- Position + anchor the equipment
- Connect utilities + test run
- Customer walkthrough + sign-off
02 / Proof of work
03 / Notes
Customer signed off on site. Spare anchors left with facilities.